Secure I.T. Environments Ltd, one of the UK’s leading designers and builders of modular data centres, containerised data centres and refurbishment of any existing data centre, has been awarded a three-year data centre maintenance contract at The Queen Elizabeth Hospital King’s Lynn NHS Trust.
Read MoreThree young, talented engineers have been appointed into key design roles at global loadbank manufacturer, Crestchic’s factory in the Midlands.
Read MoreOffers optimised footprint, advanced product features, and competitive specifications.
Read MoreCrestchic has supplied the University of Chester with a nominally rated 300 kVA restive/reactive loadbank. This has been installed at its research and development facility at the Energy Centre situated in Thornton Science Park. The contractors for the project, A+B Engineering, selected Crestchic for its specialism in this area.
Read MoreSix weeks since the TSB crisis and new research from business continuity and disaster recovery provider, Databarracks, has revealed that 85 per cent of organisations say they would struggle to survive if there was a loss of mission critical IT systems for longer than a month.
Read MoreThere have been many rumblings of late that centre around the demise of traditional standalone UPS systems and the market longevity of these. It is undeniable that the market is saturated when it comes to centralised UPS. Technology seems to have plateaued and the performance delivered from different manufacturers has become fairly ubiquitous. This has meant that manufacturers are now having to compete on cost and subsequently, judging from the latest industry figures, are making less profit.
Read More